Rockport, Indiana
Babcock Power – AEP Rockport Unit 2 – SCR
This project was an SCR Construction that was fabricated for Babcock Power and American Electric Power in Rockport, Indiana. Total material fabricated was approximately 2,563 tons of carbon steel fabricated from July 2018 – December 2019. All components were trial-fitted in our shop prior to shipping to ensure there were no issues with field erection.